International transportation and wharf
The port of Wanxiang Nickel Industry is convenient for logistics: the construction of the port and the park is integrated. The coastline of the park is about 5 kilometers long from north to south. The port coastline of the port area generally runs from northwest to southeast. There are three planned deep-water port areas, of which a total of one has been built and is under construction. Terminal berths 2 general cargo terminal berths 20 special berths for laterite mines. It is planned that a total of 8 bulk cargo wharf berths of 200,000-ton wharf in the southern area adopt high-piled beam-slab structure, which can accommodate 20,000-ton, 75,000-ton and 200,000-ton ships.
万向
10,000-ton gravity general terminal 100,000-ton gravity general terminal 200,000-ton gravity general terminal
One 100,000-ton wharf; high-pile beam-slab structure is adopted, which can accommodate 20,000-ton and 75,000-ton ships to berth in-line. The total length of the terminal berth is 461m and the width is 30m, including one 20,000-ton general cargo berth (three 40-ton 38-meter gantry cranes are installed at the terminal) for loading and unloading products, general cargo, containers, etc.; a 75,000-ton bulk cargo berth, 75,000 The design of seamless connection between 20,000-ton and 20,000-ton berths can be taken into account, and a 100,000-ton class bulk carrier can be berthed (five 40-ton 38-meter seat-type bucket gate cranes and one 4000T/H belt conveyor at the wharf) a 75,000-ton bulk carrier The cargo coal ship can be unloaded in about 40 hours, with an annual throughput of about 15 million tons.
Cooperation cases
Cooperation Case
The first production line successfully realized the ignition oven
Indonesia Wanxiang Nickel Industrial Park Phase II
China exported 388,000 new energy vehicles
Indonesia Wanxiang Nickel Industrial Park Phase I
Copyright© 2026 万向镍业股份有限公司版权所有   沪ICP备2022026483号 SiteMap